← All tools
SLABIQ
FREE TOOL · TRADIEROLES.COM
Total concrete0.00
Ready-mix order— m³
Or 20 kg bags
Approx mass— t

Job

Waste covers uneven ground, spillage and over-excavation — 10% is typical for slabs on ground, more for rough trenches. Ready-mix rounds up to the nearest 0.2 m³. Bag figure uses ~110 × 20 kg bags per m³ (check your product's yield).

Pours

Order summary

Volumes are geometric with your waste factor applied at the end. Confirm mix specification (MPa, slump, aggregate), reinforcement and curing requirements with your engineer or supplier — this tool orders the volume, not the spec.