Before you use this sheet

This is a free record template from TradieRoles, provided by FTC Group Pty Ltd. It records a gas soundness test, it does not perform or certify it.

← All tools TradieRoles

GasIQ

Gas Soundness Sheet
Leakage test & appliance commissioning · AS/NZS 5601.1
Leakage test & appliance commissioning · NZS 5261 / AS/NZS 5601
AU · AS/NZS 5601
AS/NZS 5601.1 soundness test. Record the pressure test and the let-by test. The installation must show no perceptible pressure drop over the required test period at the specified test pressure before appliances are connected and commissioned.
NZS 5261 soundness test. Record the pressure test and the let-by test. The installation must hold the specified test pressure with no permitted drop over the test period before appliances are connected and commissioned.
1Soundness (leakage) test
2Purge
3Appliance commissioning
Appliance Gas rate (MJ/h) Burner pressure (kPa) Combustion / CO (ppm) Flue / ventilation Result
4Declaration
I certify the gas installation described was tested and commissioned in accordance with AS/NZS 5601.1 and the results above are a true record. A Certificate of Compliance is to be issued as required by the relevant State or Territory gas regulator.
I certify the gas installation described was tested and commissioned in accordance with NZS 5261 and the results above are a true record. A gas Certification / Certificate of Compliance is to be issued and supplied as required under the Gas (Safety and Measurement) Regulations.
Free record template · TradieRoles Tools · © FTC Group Pty Ltd (ABN 70 694 989 994). Provided as-is with no warranty. Testing, commissioning and certification remain the responsibility of the licensed / authorised gasfitter. Verify against the current edition of AS/NZS 5601.1 (AU) or NZS 5261 (NZ).