AS/NZS 5601.1 soundness test. Record the pressure test and the let-by test. The installation must show no perceptible pressure drop over the required test period at the specified test pressure before appliances are connected and commissioned.
NZS 5261 soundness test. Record the pressure test and the let-by test. The installation must hold the specified test pressure with no permitted drop over the test period before appliances are connected and commissioned.
1Soundness (leakage) test
2Purge
3Appliance commissioning
Appliance
Gas rate (MJ/h)
Burner pressure (kPa)
Combustion / CO (ppm)
Flue / ventilation
Result
4Declaration
I certify the gas installation described was tested and commissioned in accordance with AS/NZS 5601.1 and the results above are a true record. A Certificate of Compliance is to be issued as required by the relevant State or Territory gas regulator.
I certify the gas installation described was tested and commissioned in accordance with NZS 5261 and the results above are a true record. A gas Certification / Certificate of Compliance is to be issued and supplied as required under the Gas (Safety and Measurement) Regulations.